Maintenance Details


Date31 Jul 2020
Start Time11:00:01
End Time12:00:01
Nature Of MaintenanceMechanical
EquipmentHYDRAULIC POWER PACK NO. 2
Type of MaintenanceScheduled Maintenance
Details1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage
Remark
FurnaceFurnace II
StatusCompleted