Maintenance Details


Date30 Jul 2020
Start Time13:30:01
End Time14:30:01
Nature Of MaintenanceMechanical
EquipmentPOLLUTION 2
Type of MaintenanceScheduled Maintenance
DetailsPOLLUTION ID FANS FOR (Furnace 2)

POLLUTION ID FANS FOR (Furnace 2)
1. open cover and clean dust.clean and balancing is done.
2. check the balancing of impeller and vibration isolation.it is ok.
3. check v belts condition and inform if it's on critical stage.it is ok.
4. check foundation bolts and nuts of Plummer blocks.it is ok.
5. greasing the Plummer blocks.greasing is done.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature. it is ok.
Remark
FurnaceOther
StatusCompleted