Maintenance Details


Date30 Jul 2020
Start Time07:30:01
End Time09:00:01
Nature Of MaintenanceMechanical
EquipmentCHIPPING YARD CRANE NO. 2
Type of MaintenanceScheduled Maintenance
DetailsCHIPPING YARD E.O.T. CRANE 2
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.greasing is done.
2. check the gearbox oil
level, leakage, and fill if required.no leakage. We fill a small amount of grease.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.greasing is done. Shaft condition is ok.
2. check the gearbox oil level, leakage, and fill if required.no leakage. We fill a small amount of grease.
3. check all fasteners and mounting bolts. it's ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition and do the greasing.
Greasing is done.

HT.
1. check rope drum, hook, rope condition. greasing of rope.greasing is done.
2. check the thruster drum condition and its brake tightness.no thruster.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok.
Remark
FurnaceOther
StatusCompleted