Maintenance Details


Date29 Jul 2020
Start Time14:00:01
End Time15:00:01
Nature Of MaintenanceMechanical
EquipmentCARBON PASTE LIFTING CRANE
Type of MaintenanceScheduled Maintenance
Details3RD FLOOR CARBON PASTE LIFTING CRANE

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing. Greasing is done.
2. check the gearbox oil level, leakage, and fill if required. It is OK.
3. check all fasteners and mounting bolts.it is ok.
4. check frame welding conditions.it is ok.
5. check end traveling gears condition and do the greasing. It is ok.
6.
CT.
It is ok. Gear bearing is ok.w


HT.
It's is ok. Pulley's condition is ok.
rope greasing is done.
Remark
FurnaceOther
StatusCompleted