Maintenance Details


Date27 Jul 2020
Start Time07:30:01
End Time16:30:01
Nature Of MaintenanceMechanical
EquipmentRMHS CONVEYOR
Type of MaintenanceScheduled Maintenance
DetailsALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7

1. greasing of bearings.greasing is done.
2. lubrication of rollers and check conditions.its ok.
3. check belt status ( if damaged than inform and change) and also check tightness, speed. we will change BC 1 and BC 6 when its coming.WE REPAIR BC 2 AND BC 6.
4. gearbox oil level check and if not then fill as per requirement.its ok.
5. check coupling and key ( if damaged than inform and change) and do the greasing.it's ok. we will change BC 1 motor coupling when we change belt.
6. check the drum condition. its ok.
7. check mounting frame welding condition.its ok.
8. check rollers condition and if not good then change.
Remark
FurnaceOther
StatusCompleted