Maintenance Details


Date25 Jul 2020
Start Time07:30:01
End Time16:30:01
Nature Of MaintenanceElectrical
EquipmentWASHING PLANT
Type of MaintenanceScheduled Maintenance
DetailsWASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. Check it is ok.
2. check panel board, clean, & tight all loose parts. Clean and tight all lose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly. It's ok.
5. check the high mast lights also. it's ok.
Remark
FurnaceOther
StatusCompleted