SAFAL/P/MN ORE/10.01/2021
| Contract Number | SAFAL/P/MN ORE/10.01/2021 |
| Contract Date | 28 Sep 2021 |
| Type | Purchase |
| Supplier Name | ENOC BANDA |
| Description of Goods | Manganese Ore |
| Grade | Low (32% - 38%) |
| Size | 10-150MM (MIN 90%) |
| Specifications | MG NIN 40% |
| Quantity | 17 |
| Weight Unit | Metric Tonne |
| Destination | SAFAL PLANT KANONA |
| Rate | 30 |
| Currency | Zambian Kwacha |
| VAT % | 0 |
| Mode/Terms of Payment | Upon delivery at SAFAL plant and testing of the material |
| Terms of Delivery | Ex Mine loaded on trucks with documents - MRT EXCLUSIVE |
| Delivery Period | immediate |
| Dispatch Through | BUYER HIRED TRUCKS |
| Lot Number | ENOCK BANDA GRADE 48 |
| Remark | |
| Other Reference(s) | |
|---|
Total Supply: 0