| Contract Number | SAFAL/P/MN ORE/10.01/2021 |
| Contract Date | 12 Oct 2021 |
| Type | Purchase |
| Supplier Name | Enock Kapalu Nyundu-Mn ore |
| Description of Goods | Manganese Ore |
| Grade | Medium (38% - 44%) |
| Size | 10-150MM (MIN 90%) |
| Specifications | MN MIN 40% |
| Quantity | 200 |
| Weight Unit | Metric Tonne |
| Destination | SAFAL PLANT KANONA |
| Rate | 1310 |
| Currency | Zambian Kwacha |
| VAT % | 0 |
| Mode/Terms of Payment | Upon delivery at SAFAL plant and testing of the material |
| Terms of Delivery | Ex Mine loaded on trucks with documents - MRT EXCLUSIVE |
| Delivery Period | immediate |
| Dispatch Through | SUPPLIER HIRED TRUCKS |
| Lot Number | Enock Kapalu Nyundu- Mn Ore |
| Remark | 1. Price of the material shall be as per below:
(A) 42.1 % to 44% materials at ZMW 1250/MT Mineral Royalty tax exclusive ex warehouse Mansa loaded on trucks with documents
(B) 44.1% to 46 % materials at ZMW 1310/MT Mineral Royalty tax exclusive ex warehouse Mansa loaded on trucks with documents
(C) 46,1% to 48% materials at ZMW 1360/MT Mineral Royalty tax exclusive ex warehouse Mansa loaded on trucks with documents
(D) 48.1 % to 52% materials at ZMW 1400/MT Mineral Royalty tax exclusive ex warehouse Mansa loaded on trucks with documents
Phosphorus percentage should be less than 0.15%.
Note: Minimum Acceptable Grade is 42 % below this level material shall be considered out of specs and hence pro rate deduction shall Applied..
|
| Other Reference(s) | Each truck to have mining license copy, Police clearance & council receipt |
|---|