Maintenance Details


Date17 Jul 2020
Start Time09:30:01
End Time10:00:01
Nature Of MaintenanceMechanical
EquipmentHYDRAULIC POWER PACK NO. 1
Type of MaintenanceScheduled Maintenance
Details1. checking loose parts and check the hydraulic oil level in the tank.its ok.
2. check solenoid valve working conditions and adjust oil pressure.solenoid is ok.
3. check hydraulic line leakage. E3 slipping cylinder has small leakage.
Remark
FurnaceFurnace I
StatusCompleted