SAFAL/P/MN ORE/08.01/2021
| Contract Number | SAFAL/P/MN ORE/08.01/2021 |
| Contract Date | 24 Aug 2021 |
| Type | Purchase |
| Supplier Name | CAMM MINING LTD |
| Description of Goods | Manganese Ore |
| Grade | High (44% - 50%) |
| Size | 10-150MM (MIN 90%) |
| Specifications | MN MINIMUM 48% |
| Quantity | 1000 |
| Weight Unit | Metric Tonne |
| Destination | SAFAL PLANT KANONA |
| Rate | 1575 |
| Currency | Zambian Kwacha |
| VAT % | 0 |
| Mode/Terms of Payment | Upon delivery at SAFAL plant and testing of the material |
| Terms of Delivery | Delivered Kanona, MRT exclusive |
| Delivery Period | immediate |
| Dispatch Through | SUPPLIER HIRED TRUCKS |
| Lot Number | CAMM MINING 48% |
| Remark | |
| Other Reference(s) | |
|---|
Showing 1-1 of 1 item.
| # | Supply Date | Supplier Name | Item | Grade (%) | Inward Quantity |
| 1 | 30 Aug 2021 | CAMM MINING LTD | Manganese Ore | High (44% - 50%) | 41.23 |
Total Supply: 41.23