Maintenance Details


Date11 Jul 2020
Start Time00:03:01
End Time00:03:01
Nature Of MaintenanceElectrical
EquipmentWASHING PLANT
Type of MaintenanceScheduled Maintenance
DetailsProduction team says that the don't have washed material. So we do it's maintenance on Tuesday.

WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also.
Remark
FurnaceOther
StatusCompleted