SAFAL/P/MN ORE/07.29/2021
| Contract Number | SAFAL/P/MN ORE/07.29/2021 |
| Contract Date | 06 Jul 2021 |
| Type | Purchase |
| Supplier Name | Debansy Engineering Ltd |
| Description of Goods | Manganese Ore |
| Grade | Ultra Low (Below 32%) |
| Size | 25-150 MM (90% Min) |
| Specifications | Mn 36% Min |
| Quantity | 500 |
| Weight Unit | Metric Tonne |
| Destination | SAFAL Plant, Kanona |
| Rate | 40 |
| Currency | US Dollar |
| VAT % | 0 |
| Mode/Terms of Payment | Upon delivery at SAFAL plant and testing of the material |
| Terms of Delivery | Loaded on trucks with documents, MRT inclusive |
| Delivery Period | Immediate |
| Dispatch Through | Buyer hired trucks |
| Lot Number | Debansy Engineering Mn Ore LG |
| Remark | |
| Other Reference(s) | |
|---|
Showing 1-8 of 8 items.
| # | Supply Date | Supplier Name | Item | Grade (%) | Inward Quantity |
| 1 | 22 Jun 2021 | Debansy Engineering Ltd | Manganese Ore | Ultra Low (Below 32%) | 32.7 |
| 2 | 24 Jun 2021 | Debansy Engineering Ltd | Manganese Ore | Ultra Low (Below 32%) | 42.145 |
| 3 | 26 Jun 2021 | Debansy Engineering Ltd | Manganese Ore | Ultra Low (Below 32%) | 39.055 |
| 4 | 29 Jun 2021 | Debansy Engineering Ltd | Manganese Ore | Ultra Low (Below 32%) | 40.715 |
| 5 | 30 Jun 2021 | Debansy Engineering Ltd | Manganese Ore | Ultra Low (Below 32%) | 42.575 |
| 6 | 02 Jul 2021 | Debansy Engineering Ltd | Manganese Ore | Ultra Low (Below 32%) | 39.02 |
| 7 | 07 Jul 2021 | Debansy Engineering Ltd | Manganese Ore | Ultra Low (Below 32%) | 35.96 |
| 8 | 09 Jul 2021 | Debansy Engineering Ltd | Manganese Ore | Ultra Low (Below 32%) | 36.495 |
Total Supply: 308.67