Maintenance Details
| Date | 08 Jul 2020 |
|---|---|
| Start Time | 11:30:00 |
| End Time | 12:30:01 |
| Nature Of Maintenance | Mechanical |
| Equipment | CARBON PASTE LIFTING CRANE |
| Type of Maintenance | Scheduled Maintenance |
| Details | 3RD FLOOR CARBON PASTE LIFTING CRANE LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. 2. check the gearbox oil level, leakage, and fill if required. leakage is there we fill grease. 3. check all fasteners and mounting bolts. it's ok. 4. check frame welding conditions. its ok. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. is gear condition is ok. 3. check all fasteners and mounting bolts. its ok. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. HT. 1. check rope drum, hook, rope condition. greasing of rope. The greasing of rope is done. 2. check the thruster drum condition and its brake tightness. no thruster. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. its ok. |
| Remark | |
| Furnace | Other |
| Status | Completed |