Maintenance Details


Date03 Jul 2020
Start Time07:30:01
End Time12:30:01
Nature Of MaintenanceMechanical
EquipmentHYDRAULIC POWER PACK NO. 2
Type of MaintenanceScheduled Maintenance
Details1. checking loose parts and check the hydraulic oil level in the tank.hydrauliac oil level is low. we need to fill oil. tomorrow we fill oil in the tank.
2. check solenoid valve working conditions and adjust oil pressure. it is ok.
3. check hydraulic line leakage. it is ok.
Remark
FurnaceFurnace II
StatusCompleted