Supply Date20 May 2020
Contract NumberSAFAL/P/MN ORE/05.41/2020
ItemManganese Ore
Supplier NameSimpemba Jere
Grade (%)Medium (38% - 44%)
Lot NumberSimpemba Jere- Mn Ore
Deviance0
Inward Quantity23.915
Freight260
Loading Charges0
Offloading Charges0
Royalty69.986
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1174.16
Conversion Rate (Please insert 1 if no conversion is required)16.905
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn37.10
Fe2.50
SiO217.50
Al2O38.50
P0.14
Size 0-10MM3.45
Size 10-20MM2.62
Size 20-100MM84.98
Size +100MM8.95