Maintenance Details


Date01 Jul 2020
Start Time11:00:01
End Time12:30:01
Nature Of MaintenanceMechanical
EquipmentCARBON PASTE LIFTING CRANE
Type of MaintenanceScheduled Maintenance
Details3RD FLOOR CARBON PASTE LIFTING CRANE

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.gearbox oil level is ok.coupling greasing is done.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.its ok.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
its gear condition is ok.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT. rope condition is ok.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness. no thruster.
3. check all fasteners and mounting bolts.its ok.
4. check frame welding conditions. it ok.
Remark
FurnaceOther
StatusCompleted