Maintenance Details
| Date | 29 Jun 2020 |
|---|---|
| Start Time | 07:30:01 |
| End Time | 16:30:01 |
| Nature Of Maintenance | Mechanical |
| Equipment | RMHS CONVEYOR |
| Type of Maintenance | Scheduled Maintenance |
| Details | ALL CONVEYORS BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7 1. greasing of bearings.greasing is done. 2. lubrication of rollers and check conditions.it is ok. 3. check belt status ( if damaged than inform and change) and also check tightness, speed.BC 6 belt repairing. And BC 2 side separator plate fixing. BC 1 BELT CONDITION IS NOT GOOD. WE CHNAGE IT AFTER 2 WEEKS. 4. gearbox oil level check and if not then fill as per requirement.it is ok 5. check coupling and key ( if damaged than inform and change) and do the greasing.greasing is done. 6. check the drum condition. 7. check mounting frame welding condition.it is ok. 8. check rollers condition and if not good then change. |
| Remark | |
| Furnace | Other |
| Status | Completed |