Maintenance Details


Date26 Jun 2020
Start Time07:30:00
End Time08:30:01
Nature Of MaintenanceMechanical
EquipmentHYDRAULIC POWER PACK NO. 2
Type of MaintenanceScheduled Maintenance
Details1. checking loose parts and checked the hydraulic oil level in the tank. The oil level is ok.
2. check solenoid valve working conditions. all valve working properly.
3.No leakage in line.
Remark
FurnaceFurnace II
StatusCompleted