Maintenance Details
| Date | 26 Jun 2020 |
|---|---|
| Start Time | 07:30:00 |
| End Time | 08:30:01 |
| Nature Of Maintenance | Mechanical |
| Equipment | HYDRAULIC POWER PACK NO. 2 |
| Type of Maintenance | Scheduled Maintenance |
| Details | 1. checking loose parts and checked the hydraulic oil level in the tank. The oil level is ok. 2. check solenoid valve working conditions. all valve working properly. 3.No leakage in line. |
| Remark | |
| Furnace | Furnace II |
| Status | Completed |