Maintenance Details


Date25 Jun 2020
Start Time13:30:01
End Time14:30:01
Nature Of MaintenanceMechanical
EquipmentCHIPPING YARD CRANE NO. 2
Type of MaintenanceScheduled Maintenance
DetailsCHIPPING YARD E.O.T. CRANE 2

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok.
2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions. it is ok.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok.
2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions. it is ok.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope. greasing is done. it is ok.
2. check the thruster drum condition and its brake tightness. no thruster.
3. check all fasteners and mounting bolts. It is ok.
4. check frame welding conditions.it is ok.
Remark
FurnaceOther
StatusCompleted