Maintenance Details
| Date | 24 Jun 2020 |
|---|---|
| Start Time | 07:30:01 |
| End Time | 08:30:01 |
| Nature Of Maintenance | Electrical |
| Equipment | TAPPING SEC. CRANE NO. 3 |
| Type of Maintenance | Scheduled Maintenance |
| Details | TAPPING SECTION E.O.T. CRANE 3 LT. 1. checked the motor condition ( amp, volt, and connectivity). it is ok. 2. checked panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition.it is ok. CT. 1. checked the motor condition ( amp, volt, and connectivity). it is ok. 2. checked panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition.it is ok. HT. 1. checked the motor condition ( amp, volt, and connectivity). it is ok. 2. checked panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition.it is ok. |
| Remark | |
| Furnace | Other |
| Status | Completed |