Supply Date21 May 2026
Contract NumberSAFAL/P/MANGANESE ORE/04/2026/63
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $72
Deviance0
Inward Quantity35.7
Freight15.773015873
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3169.2
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.26
Fe2.74
SiO28.40
Al2O35.60
P0.161
Size 0-10MM60.24
Size 10-20MM25.56
Size 20-100MM14.20
Size +100MM.
MOISTURE3.56