Raw Material Inward
| Supply Date | 14 May 2026 |
|---|---|
| Contract Number | SAFAL/P/COKE/03/2026/56 |
| Item | Coke |
| Supplier Name | ANDY POWER ENTERPRISES LIMITED |
| Grade (%) | FC >80% |
| Lot Number | Andy 5-15mm $ 300 |
| Deviance | 0 |
| Inward Quantity | 29.04 |
| Freight | 0 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 0 |
| Other Cost | 0 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 9292.8 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |