Supply Date14 May 2026
Contract NumberSAFAL/P/MANGANESE ORE/04/2026/63
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $72
Deviance0
Inward Quantity32.3
Freight15.773015873
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2867.37
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.06
Fe3.35
SiO29.49
Al2O35.18
P0.126
Size 0-10MM50.65
Size 10-20MM28.97
Size 20-100MM20.38
Size +100MM.
MOISTURE4.24