Supply Date15 May 2026
Contract NumberSAFAL/P/MANGANESE ORE/04/2026/67
ItemManganese Ore
Supplier NameTrue Ore Mines and Mineral ( Zambia) Limited
Grade (%)High (44% - 50%)
Lot NumberTrue Ore HG 2026
Deviance0
Inward Quantity45.74
Freight22.9756501458
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4481.41
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.35
Fe3.24
SiO210.38
Al2O37.22
P0.124
Size 0-10MM11.28
Size 10-20MM19.80
Size 20-100MM68.92
Size +100MM.
MOISTURE2.18