Raw Material Inward
| Supply Date | 06 May 2026 |
|---|---|
| Contract Number | SAFAL/P/MANGANESE ORE/05/2026/71 |
| Item | Manganese Ore |
| Supplier Name | EXORYXI MINING LIMITED |
| Grade (%) | High (44% - 50%) |
| Lot Number | Exor Mining Mn 45g |
| Deviance | 0 |
| Inward Quantity | 35.08 |
| Freight | 0 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 0 |
| Other Cost | 0 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 4139.44 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |