Raw Material Inward
| Supply Date | 02 Apr 2026 |
|---|---|
| Contract Number | SAFAL/P/IRON ORE/02/2026/30 |
| Item | Iron Ore |
| Supplier Name | ACCELETATED GERMINATION CORPORATION |
| Grade (%) | N/A |
| Lot Number | Accelerated Iron Ore 2026 |
| Deviance | 0 |
| Inward Quantity | 29.6 |
| Freight | 0 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 0.277631731 |
| Other Cost | 0 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 1311.68 |
| Conversion Rate (Please insert 1 if no conversion is required) | 19.3025 |
| Inward Status | Accepted |