Supply Date19 Mar 2026
Contract NumberSAFAL/P/IRON ORE/01/2026/6
ItemIron Ore
Supplier NameJIMMY BANDA
Grade (%)N/A
Lot NumberJIMMY BANDA IRON ORE K650
Deviance0
Inward Quantity25.7
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost852.84
Conversion Rate (Please insert 1 if no conversion is required)19.5876
Inward StatusAccepted

Raw Material Test

Showing 1-12 of 12 items.
Raw Material ComponentValue
Fe66.50
Mn0.93
SiO23.84
Al2O39.18
P0.195
Size 0-10MM4.68
Fe
Mn
SiO2
Al2O3
P
Size 0-10MM