Raw Material Inward
| Supply Date | 10 Mar 2026 |
|---|---|
| Contract Number | SAFAL/P/MANGANESE ORE/03/2026/51 |
| Item | Manganese Ore |
| Supplier Name | MWITCO INVESTMENTS AND TECHNOLOGY LIMITED |
| Grade (%) | High (44% - 50%) |
| Lot Number | MWITCO HG Ore 2026 |
| Deviance | 0 |
| Inward Quantity | 32.64 |
| Freight | 0 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 0 |
| Other Cost | 0 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 2350.08 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Rejected |