Supply Date19 Feb 2026
Contract NumberSAFAL/P/IRON ORE/02/2026/43
ItemIron Ore
Supplier NameKEMOSE MINING LIMITED
Grade (%)N/A
Lot NumberKEMOSE MINING IRON 2026
Deviance0
Inward Quantity23.04
Freight0
Loading Charges0
Offloading Charges0
Royalty0.263056987
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost801.45
Conversion Rate (Please insert 1 if no conversion is required)18.8286
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe68.80
Mn0.43
SiO22.73
Al2O38.04
P0.148
Size 0-10MM4.58