Supply Date10 Feb 2026
Contract NumberSAFAL/P/IRON ORE/02/2026/30
ItemIron Ore
Supplier NameACCELETATED GERMINATION CORPORATION
Grade (%)N/A
Lot NumberAccelerated Iron Ore 2026
Deviance0
Inward Quantity28.88
Freight0
Loading Charges0
Offloading Charges0
Royalty0.260443614
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1146.47
Conversion Rate (Please insert 1 if no conversion is required)19.0176
Inward StatusRejected

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe55.60
Size 0-10MM5.26
P0.138
Al2O33.16
SiO22.53
Mn7.70