Raw Material Inward
| Supply Date | 07 Feb 2026 |
|---|---|
| Contract Number | SAFAL/P/MANGANESE ORE/01/2026/8 |
| Item | Manganese Ore |
| Supplier Name | Twatota Mining Company Limited |
| Grade (%) | Medium (38% - 44%) |
| Lot Number | Twatota Mining Mn +40% |
| Deviance | 0 |
| Inward Quantity | 34.2 |
| Freight | 16.6240409207 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 4.087285563 |
| Other Cost | 0.6140350703 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 3294.33 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |