Supply Date05 Feb 2026
Contract NumberSAFAL/P/MANGANESE ORE/01/2026/10
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $72
Deviance0
Inward Quantity34.52
Freight17.2872340425
Loading Charges0
Offloading Charges0
Royalty3.621012179
Other Cost-2.8694999785
Quality Deviance0
Grade Deviance0
Total Cost3073.62
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.12
Fe4.46
SiO211.80
Al2O34.30
P0.130
Size 0-10MM56.70
Size 10-20MM21.70
Size 20-100MM21.60
Size +100MM.
MOISTURE5.34