Supply Date04 Feb 2026
Contract NumberSAFAL/P/MANGANESE ORE/01/2026/10
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $72
Deviance0
Inward Quantity33.12
Freight17.2872340425
Loading Charges0
Offloading Charges0
Royalty3.708933986
Other Cost-2.8694999795
Quality Deviance0
Grade Deviance0
Total Cost2951.88
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
SiO211.67
Fe4.41
Mn38.58
Al2O35.12
P0.128
Size 0-10MM55.10
Size 10-20MM24.52
Size 20-100MM20.38
Size +100MM.
MOISTURE3.50