Supply Date01 Feb 2026
Contract NumberSAFAL/P/MANGANESE ORE/01/2026/8
ItemManganese Ore
Supplier NameTwatota Mining Company Limited
Grade (%)Medium (38% - 44%)
Lot NumberTwatota Mining Mn +40%
Deviance0
Inward Quantity33.62
Freight16.3604329222
Loading Charges0
Offloading Charges0
Royalty4.00885633
Other Cost-0.1784651512
Quality Deviance0
Grade Deviance0
Total Cost3200.32
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Size 20-100MM16.55
Size 10-20MM32.60
Size 0-10MM50.85
P0.127
Al2O34.03
SiO27.17
Fe2.57
Mn41.23
MOISTURE5.84
Size +100MM.