Supply Date08 Sep 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity25.24
Freight0
Loading Charges0
Offloading Charges0
Royalty4.062811
Other Cost8.64461172741
Quality Deviance0
Grade Deviance0
Total Cost2502.62
Conversion Rate (Please insert 1 if no conversion is required)23.9457
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn44.40
Fe5.80
SiO28.50
Al2O34.39
P0.127
Size 0-10MM6.92
Size 10-20MM12.58
Size 20-100MM70.61
Size +100MM9.89
MOISTURE2.38