Supply Date22 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity34.32
Freight13.0151843817
Loading Charges0
Offloading Charges0
Royalty3.4591872
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3002.12
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.73
Fe2.81
SiO26.37
Al2O35.85
P0.126
Size 0-10MM51.64
Size 10-20MM32.44
Size 20-100MM15.92
Size +100MM.
MOISTURE4.64