Supply Date20 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity41.12
Freight13.0151843817
Loading Charges0
Offloading Charges0
Royalty3.5946745
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3602.52
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.52
Fe2.63
SiO28.65
Al2O36.75
P0.124
Size 0-10MM35.60
Size 10-20MM34.05
Size 20-100MM30.35
Size +100MM.
MOISTURE3.80