Supply Date19 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity33.32
Freight13.0434782608
Loading Charges0
Offloading Charges0
Royalty3.068597
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2902.57
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.32
Fe2.57
SiO214.71
Al2O35.19
P0.123
Size 0-10MM48.32
Size 10-20MM37.60
Size 20-100MM14.08
Size +100MM.
MOISTURE3.60