Supply Date18 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity45.2
Freight13.0434782608
Loading Charges0
Offloading Charges0
Royalty3.1039246
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3939.06
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.54
Fe2.11
SiO214.16
Al2O35.08
P0.123
Size 0-10MM52.16
Size 10-20MM33.59
Size 20-100MM14.25
Size +100MM.
MOISTURE3.60