Supply Date01 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity39.6
Freight0
Loading Charges0
Offloading Charges0
Royalty3.734797
Other Cost4.49015151515
Quality Deviance0
Grade Deviance0
Total Cost3899.09
Conversion Rate (Please insert 1 if no conversion is required)22.9396
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.22
Fe3.59
SiO210.57
Al2O36.64
P0.120
Size 0-10MM6.13
Size 10-20MM12.50
Size 20-100MM73.85
Size +100MM7.52
MOISTURE1.82