Supply Date30 Jul 2025
Contract NumberSAFAL/P/IRON ORE/07/2025/58
ItemIron Ore
Supplier NameJIMMY BANDA
Grade (%)N/A
Lot NumberIron Ore- JIMMY BANDA
Deviance0
Inward Quantity28.58
Freight0
Loading Charges0
Offloading Charges0
Royalty0.76116410263
Other Cost-2.17459762071
Quality Deviance0
Grade Deviance0
Total Cost829.77
Conversion Rate (Please insert 1 if no conversion is required)22.9911
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe68.56
Mn1.94
SiO23.12
Al2O33.73
P0.145
Size 0-10MM3.42