Supply Date29 Jul 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity47.08
Freight0
Loading Charges0
Offloading Charges0
Royalty2.86040851
Other Cost-5.9764231096
Quality Deviance0
Grade Deviance0
Total Cost4084.26
Conversion Rate (Please insert 1 if no conversion is required)23.0339
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.34
Fe4.42
SiO211.71
Al2O310.24
P0.169
Size 0-10MM24.03
Size 10-20MM40.07
Size 20-100MM35.90
Size +100MM.
MOISTURE2.18