Supply Date17 Jul 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity41.28
Freight0
Loading Charges0
Offloading Charges0
Royalty2.68179838
Other Cost-13.2679263565
Quality Deviance0
Grade Deviance0
Total Cost3292.39
Conversion Rate (Please insert 1 if no conversion is required)22.9125
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn36.06
Fe4.81
SiO218.22
Al2O36.10
P0.123
Size 0-10MM8.64
Size 10-20MM16.28
Size 20-100MM68.73
Size +100MM6.35
MOISTURE2.50