Supply Date07 Jul 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity33.38
Freight0
Loading Charges0
Offloading Charges0
Royalty3.30810867
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2954.57
Conversion Rate (Please insert 1 if no conversion is required)24.2943
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.24
Fe3.30
SiO211.42
Al2O35.76
P0.119
Size 0-10MM7.60
Size 10-20MM16.84
Size 20-100MM69.92
Size +100MM5.64
MOISTURE3.12