Supply Date02 Jul 2025
Contract NumberSAFAL/P/IRON ORE/05/2025/21
ItemIron Ore
Supplier NameAlex siulemba
Grade (%)N/A
Lot NumberALEX SILUMBA IRON ORE FY 2023
Deviance0
Inward Quantity41.08
Freight0
Loading Charges0
Offloading Charges0
Royalty0.79133035126
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1452.59
Conversion Rate (Please insert 1 if no conversion is required)24.0102
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe67.50
Mn0.84
SiO22.12
Al2O34.80
P0.132
Size 0-10MM4.35