Supply Date27 Jun 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/33
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity38.08
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3326.27
Conversion Rate (Please insert 1 if no conversion is required)23.6979
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.34
Fe2.78
SiO217.12
Al2O36.93
P0.122
Size 0-10MM11.20
Size 10-20MM25.68
Size 20-100MM60.08
Size +100MM3.04
MOISTURE2.68