Supply Date05 May 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity43.98
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-3.79990904956
Quality Deviance0
Grade Deviance0
Total Cost3351.28
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.10
Fe6.04
SiO217.12
Al2O36.72
P0.122
Size 0-10MM8.64
Size 10-20MM13.20
Size 20-100MM75.52
Size +100MM2.64
MOISTURE4.28