Supply Date01 May 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity60.22
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-15
Quality Deviance0
Grade Deviance0
Total Cost3914.3
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn35.06
Fe2.10
SiO226.25
Al2O31.73
P0.124
Size 0-10MM10.52
Size 10-20MM39.63
Size 20-100MM49.85
Size +100MM.
MOISTURE4.56