Supply Date26 Apr 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity60.14
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-4.87994679082
Quality Deviance0
Grade Deviance0
Total Cost4577.86
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.56
Fe1.91
SiO224.12
Al2O31.68
P0.121
Size 0-10MM11.32
Size 10-20MM46.50
Size 20-100MM42.18
Size +100MM.
MOISTURE5.24