Supply Date01 May 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity50.84
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-15
Quality Deviance0
Grade Deviance0
Total Cost3304.6
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn35.28
Fe2.56
SiO227.11
Al2O32.49
P0.124
Size 0-10MM8.69
Size 10-20MM41.60
Size 20-100MM49.71
Size +100MM.
MOISTURE5.10